Tuesday, 9 April 2013

Topplatform installed

Today the topplatform has been mounted on top of the Zeppelin.

The top platform was lifted by a crane under the roof of the hangar.

The Pegasos Zeppelin was placed under the crane.

 The topplatform was carefully lowered onto the top of the Zeppelin.

No comments:

Post a Comment